Connecting Key programming Hot Spots
This section describes how to connect a Key programming Hot Spot.
Proceed as follows.
- Ensure that the Net Bridge switch is on STANDBY.
-
Connect a Key programming Hot Spot to a prepared Net Bridge, or continue the
bus from the last connected bus device on the main bus, according to the
connection diagram in iLOQ Online - Design Guide.
Note:
If you are continuing the bus from another bus device, remember to remove the bus termination (TERMINATION = OFF) from the device from which you are continuing the bus.
- Set TERMINATION (TE/TEST) to ON if this bus device is the last device in this bus branch. If not, set it to OFF.
- Write down the serial number of the Key programming Hot Spot.
- When you have also connected the other bus devices, finalize the Net Bridge configuration once (see Completing the Bus Device Configuration on Net Bridge) and continue this procedure.
- On iLOQ 5 Series Manager software, check that the connected Key programming Hot Spot has been reported to the Net Bridge device list. You can recognize the Key programming Hot Spot by its serial number.