Preparing N500 Net Bridge and Connected Bus Devices for Deployment
This section describes how to prepare the N500 Net Bridge and connected bus devices for deployment.
Proceed as follows.
- Check that all devices connected to the Net Bridge have been connected according to the instructions and that the bus configuration is in accordance with the instructions.
-
Turn the Operating Mode switch to the SETUP position, the switch to the ON position, wait for a while (approx. 5 seconds), and then turn the switch to the OPERATING position.
The internal test procedure will now start.
-
Observe the green FW/DEVICES light for approximately one minute while the Net Bridge saves the bus configuration.
Check that:
-
The green FW/Devices light flashes as many times as there are devices on the main bus.
-
After a pause, the green FW/Devices light flashes as many times as there are devices on the reader buses.
-
After a pause, the green FW/Devices light flashes as many times as there are locks connected to the Door Modules.
When the bus configuration has been saved successfully, the FW/Devices light will switch to a solid orange colour, the POWER, RS-485 and SYSTEM STATUS will be a solid green, and the ONLINE light will be red.
-
- Check that the green POWER, DEVICE and BRIDGE lights are illuminated in all Door Modules.
- Check that the STATUS light is orange on all connected readers.
- The Net Bridge and its connected devices are now ready for deployment programming.
-
Place the network module on the floor plan.
The procedure is the same as for placing locks on a floor plan. For more information, see Placing Locks onto a Floor Plan.